Customization: | Available |
---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Applicable hospital size (number of beds) |
600-800beds |
Burning Ability | 500kg/ time (daily incineration3-6 times) |
Size of the Burner | 3m*2m*4.8m |
Volume of the Burner | Gasification room3.5m3,secondary bumingroom1.5m3,drift a long buming a room0.3m3 |
Third Burner | Optional |
Size of the filling entrance | 1080mm*1280mm |
Chimney | Height 14m out-radius¢460mm |
Blower | Power 1.1kw 0.55kw |
Combustion-support combustion machines | Power 0.22kw,fuelconsumption7-14kg/h |
Re-burning machine | Power 0.37kw,fuelconsumption15-26kg/h |
Running voltage | 220V or380V |
Weight | About14800 |
No | Name | Amount | Specifications | Notes |
1 | Incinerator | 1 | A3 steel refractories | Main part |
2 | The 2 combustion chamber and the combustion chamber mixed | 1 | A3 steel refractories |
Installed in the main body |
3 | Electric box | 1 | The main body | |
4 | Fluegas purification system | 1 | A3 steel refractories |
Installed in the main body |
5 | Combustion burner | 1 | BTL-14 | The main body |
6 | Reburning burner | 1 | BTL-28G | The main body |
7 | blower | 1 | 1650W/220V/380V | The main body |
8 | Ash rake | 1 | ¢200mm×4000mm | MeCan |
9 | Pump | 1 | The main body | |
10 | fuel tank | 1 | The main body | |
11 | fuel tank bracket | 1 | ¢600mm*2200mm | MeCan |
12 | Chimney | 2 | ¢460mm*10000mm ¢460mm*5000mm |
MeCan |
13 | Filter switch | 5 | The main body | |
14 | Thermocouple | 2 | 1200ºC | The main body |
15 | Operational procedures | 1 | The main body |
Model No. | MCFS-20 | MCFS-30 | MCFS-50 | MCFS-100 | MCFS-150 | MCFS-300 | MCFS-500 |
Applicable hospital (number of beds) | 30-50 beds | 50-100beds | 150-250beds | 200-300 beds | 200-300beds | 300-500 beds | 600-800beds |
Burning Ability | 10-20kg/ times | 20-30kg/ times | 50-80kg/ times | 80-100kg/ times | 100-150kg/ times | 200-300kg/ times | 300-400kg/ times |