Waste Treatment Machinery Incinerator Furnace Cremation Machine

Product Details
Customization: Available
Treatment: Burning
Transport Package: Container
Diamond Member Since 2015

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

Year of Establishment
2011-12-26
Management System Certification
ISO 9001, ISO 9000, GMP, ISO 13485
Export Year
2015-07-21
  • Waste Treatment Machinery Incinerator Furnace Cremation Machine
  • Waste Treatment Machinery Incinerator Furnace Cremation Machine
  • Waste Treatment Machinery Incinerator Furnace Cremation Machine
  • Waste Treatment Machinery Incinerator Furnace Cremation Machine
  • Waste Treatment Machinery Incinerator Furnace Cremation Machine
Find Similar Products

Basic Info.

Specification
40HQ container
Trademark
Mecan
Origin
China

Product Description

Cremation Machine Cremation Furnace Crematory Equipment Human Body Incinerator

Waste Treatment Machinery Incinerator Furnace Cremation Machine
 

During incineration, the body is exposed to a column of flames produced by a furnace fueled by natural gas, oils, propane, etc.
As the corpse is placed in the machine, the container burns down.
Next, the heat dries the body, burns the skin and hair, contracts and chars the muscles, vaporizes the soft tissues, and calcifies the bones so that they eventually crumble.
The bodies are mostly burned around half a hour. There is no smell and no smoke at all because the emissions are processed to destroy the smoke and vaporize the gases that would smell.
Our crematories machine have fourth afterburner to help burn the body completely.

 

Our cremators adapt the latest combustion technology, four times burning technology ensure the emissions purified.

First Time Combustion is direct combustion inside the primary chamber. Integrated with hot blast oxygen supply (300ºC), most smoke and gas get burned as spontaneous combusting of corpse and enforced by the main burner supporting at times.

Second Time Combustion: The smoke and gas substance released from the primary chamber gathered in the secondary burning and multiple collision take place, decomposition and oxidation of that harmful substances speedup this way and by the special construction of the secondary burning chamber.

Third Time Combustion is the strengthen combustion of the gas and smoke. Burner starts work to strengthen the burning if temperature under 700ºC,otherwise above 700ºCthe high temperature gas and smoke burn itself matched with the suitable amount of oxygen.

Fourth Combustion occurred in the gas way and underground smoke channel, gas and gas substances flameless burned totally before injection into the atmosphere.

Cremation, as an option for the final disposition of a deceased person, has been around for thousands of years. While the beginnings of cremation involved somewhat primitive methods for achieving the end result, modern times and technology have given rise to a more standardized version of the process. Our company manufacture human size cremators that reduce the amount of time necessary to complete the cremation to less than half an hours.

 

Single Bed High-End Ash Picking Furnace Cremation Machine

Model: MC-ND01

Waste Treatment Machinery Incinerator Furnace Cremation Machine
 

Feature:

Dimensions(L*W*H)MM Single bed 5300*2400*3200
Furnace size (L*W*H)MM 2200*800*700
Main combustion chamber combustor 400,000 kcal
Secondary combustion chamber combustor 100,000 kcal
Working temperature of main combustion chamber 700-900 degree
Can withstand the highest temperature 1200 degree
Secondary combustion chamber temperature 900-1100 degree
Can withstand the highest temperature 1400 degree
Temperature control method Automatic
Fuel Light diesel
Voltage 220V or 380V(customizable)
Fan power <4kw
Total installed power <10kw
Average energy consumption 5-10KG/pcs
Incineration bed control method electric
Ignition method automatic
Continuous cremation time 35-50minutes/set
Average cooling time 15-20minutes/set
Machine noise Less than 65 decibels
Design life 15 years
Material used Shell: overall high-grade stainless steel, high-alumina refractory bricks are used in the furnace, and ceramic fiber is used in the insulation layer.

 

Mobile Cremation Machine is installed in one 40 HQ Container

Model: MC-ND01M


 

Waste Treatment Machinery Incinerator Furnace Cremation Machine

Double Bed High-End Ash Picking Furnace Cremation Machine

Model:MC-ND02

Waste Treatment Machinery Incinerator Furnace Cremation Machine
 

Specification

Number Name Double Bed Detail
1 External dimension of furnace body(mm) L*W*H=8400*2350*2500
2 Trolley size(mm) 2100*680*700

3

Furnace size(mm) 2150*700*700

4

Number of bed surface of Trolley(set) 1or 2 (Optional)
5 Use fuel 0 ~ - 10 * light diesel, city gas, natural gas, liquefied gas
6 Fuel consumption(per) 6~10 kg
7 Average cooling time (min/per) 4-15
8 Operating temperature of main combustion chamber 700~900ºC
9 Working pressure of main furnace(Pa) -2Pa~-50Pa
10 Total weight of furnace body 25 t
11 Ejector fan(kw) 7.5
12 Blower(kw) 7.5
13 Harmful gas emission Comply with relevant national environmental protection regulations
14 Floor area of equipment (m2) 14.16
15 Quality of ashes Full burning of ashes, pure white without sundries
16 Odor determination There is no peculiar smell or smoke in the cremation room
17 Equipment performance Environmental protection and energy saving, low noise and small vibration

 

MC-ND02 Furnace material of high grade ash picker

Number Name Detail
1 Refractory material The refractory material of the furnace is MeCan brand, which is famous in China. The top cover of the furnace is made of prefabricated high aluminum refractory bricks. The furnace is made of new high-strength erosion resistant aluminum carbonized silicon composite material, which can ensure the fast temperature rise in the furnace, the short time of the cremation remains and the small oil consumption. All refractory bricks and cement used for the furnace body are of high quality, cold and hot resistance, high compressive strength, fast heat absorption, good heat preservation, corrosion resistance, high stability, wear resistance, long service life, and will not automatically loosen and fall off after a long period of high temperature, with a temperature resistance of 1400 degrees.
2 Thermal insulation material It adopts high-quality aluminum silicate fiber felt board, calcium silicate board and diatomite insulation brick, with high-quality heat conduction, making the surface temperature of furnace body about 20 ºC , good insulation performance, long service life, furnace temperature drop of about 40 ºC in 24 hours after shutdown.
3 Decorative materials It adopts 0.8-1.0mm high-quality stainless steel plate, beautiful and generous, strong three-dimensional sense, corrosion resistance, convenient disassembly, maintenance and never deformation
4 Bone scaffold High quality profiles and plates are adopted, which are durable and never deformed
5 Main combustion chamber After the body enters the main combustion chamber, it is ignited by the burner and  incinerated here
6 Flue gas combustion chamber Burning the flue gas, making the flue gas stay longer in the furnace, making the toxic and harmful substances burn more fully, so as to achieve the effect of environmental protection
7 Main furnace masonry During masonry, the mortar is full of the joint surface between the brick and the brick, and the mortar joint is less than 3mm

 

 

 MC-ND02 System parameters of high grade ash sorting and cremation machine

 

Number

Name

Detail

Remark

1

Preliminary door system

The control system of the reserve door adopts the computer automatic control with LED display to ensure the operation of the two sets of operating systems of the front hall and the rear hall. Equipped with high-grade color LCD touch screen for easy operation, using micro motor to drive the reducer hydraulic control to open and close the preparatory door automatically, using high-quality super grade stainless steel plate for external decoration, beautiful and generous, sound insulation and noise reduction

 

2

Cooling chamber

After the incineration of the remains is completed, the ashes are cooled in the cooling room, which is composed of the outer framework and the decorative plate, and is cooled by the frequency conversion fan. When the temperature is lower than the ash picking temperature, the automatic alarm will be given to remind and the waiting time for bereavement will be shortened.

Cooling system

3

Collector

The hot air heat exchange device made of the new high-strength, corrosion-resistant, high-temperature and high manganese 310S stainless steel material is placed in the furnace body to provide oxygen temperature. It has the advantages of high heat transfer efficiency, good heat absorption, fast temperature rise, and can quickly raise the air temperature to more than 400 ºC, so as to achieve combustion support, strengthen combustion, save energy and reduce consumption, accelerate incineration speed and shorten incineration time.

 

4

Combustion system

High quality energy-saving burner of huierfeng brand is adopted, which can automatically ignite, control furnace temperature and pressure, control oil consumption, automatically adjust electric damper, combustion angle and smoke gate

 

5

Computer control system

It adopts TFT color LCD touch screen and special computer control (PLC) for cremation machine, which can achieve synchronous dynamic display of color and video animation and has fault diagnosis display and perfect protection function. It is equipped with three operation systems without interference switching: manual, semi-automatic and computer full-automatic. The system is safe, stable, reliable, convenient for maintenance, and equipped with automatic explosion-proof function.

Control system

6

Electrical components

Using high quality low-voltage electrical components, using pressure module and temperature module to automatically detect furnace pressure and temperature

7

Electrical control cabinet

Adopt separate electrical control cabinet, equipped with overload, short circuit and other electrical protection functions and system comprehensive control functions

8

System working voltage

380V±5%(three phase five wire system)

9

Electrical control working voltage

220VAC,24VDC

10

Wind path

It is made of new high temperature and high manganese stainless steel with high corrosion resistance, stability and compressive strength.

Air supply system

11

Blower

Pulse blast system is adopted, 7.5kW high-pressure fan is used for blower, with air volume of 1050 ~ 1200m3 / h and air pressure of 10000 ~ 12500pa.

12

Combustion supporting air duct

The end small air duct contacting high temperature is made of high temperature resistant material φ 20 * 2.5 seamless pipe. Others are made of φ 159 steel pipes, which are resistant to high temperature and corrosion.

13

Ejector fan

Venturi injection system is adopted, with 7.5kW high pressure and high air volume fan, air volume of 3650 ~ 4200m3 / h, air pressure of 4000 ~ 6000pa

Smoke exhaust system

14

Ejector bladder

It is made of 3mm high quality stainless steel plate  with long high temperature resistance and long service life.

15

Ejection chimney

3 mm thick stainless steel plate rolling is adopted, and the first section buried underground is made of 3 mm thick stainless steel plate rolling. The structure is spray type, high temperature and corrosion resistant, and the chimney height is 8-12m.

Smoke exhaust system

16

Flue structure system

The flue adopts refractory brick, heat preservation brick, aluminum Silicate fiber felt board, waterproof reinforced concrete protective layer and waterproof performance to ensure long-term non leakage.

17

Pressure control system

Use the controller to control the ram lifting, automatically adjust the furnace pressure and control it within the range of - 2 ~ - 50pA

18

High definition camera

High definition camera is used to capture the flue gas emission for easy operation

TV monitoring system

19

Color display

In order to ensure that the combustion emission reaches the best state and is easy to adjust and operate, the equipment adopts the color display to dynamically display the outdoor flue gas emission.

20

Fuel tank

Angang Steel profiles and plates are used, and the capacity meets the fire protection requirements

Oil supply system

21

Tubing

The pipeline from the oil tank to the furnace shall be wrapped with sealing tape, without oil leakage and with good sealing effect

22

National standard Micro flowmeter

Metering oil consumption and oil pipeline control oil distribution

23

Control valve

Protection oil circuit control system

Cross-Section Diagram of Cremation Machine

Waste Treatment Machinery Incinerator Furnace Cremation Machine



Waste Treatment Machinery Incinerator Furnace Cremation Machine
Waste Treatment Machinery Incinerator Furnace Cremation Machine
Waste Treatment Machinery Incinerator Furnace Cremation Machine
Waste Treatment Machinery Incinerator Furnace Cremation Machine
 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier
Product Groups
More